Octave OnSite Completions provides joint venture LNG project flexibility, accuracy and transparency

The challenge

With a project of this magnitude and complexity, effective control and management of critical data was always going to be a challenge, one that could only be overcome through the successful introduction and use of OnSite Completions.

The solution

The energy company teams needed to find a solution that could be easily picked up and used straight away, rather than a complicated system that slowed down their current processes. Additionally, the teams needed a solution that was flexible enough to support project progress and not impose artificial restrictions based on software rules.

The results

Using OnSite Completions has given the joint venture project a better understanding of their progress, with resulting efficiencies realized across the board.

Key Benefits
  • The liquified natural gas project is a joint venture between Australian energy company owner operators

  • $25 billion-dollar coal seam gas (CSG) pipeline and liquefaction (LNG) project

  • Incorporates a 530kilometers gas transmission pipeline from multiple gas processing facilities

  • Located in the Surat and Bowen gas fields in Southwest and Central Queensland on Curtis Island, off the coast of Gladstone