The challenge
With a project of this magnitude and complexity, effective control and management of critical data was always going to be a challenge, one that could only be overcome through the successful introduction and use of OnSite Completions.
The solution
The energy company teams needed to find a solution that could be easily picked up and used straight away, rather than a complicated system that slowed down their current processes. Additionally, the teams needed a solution that was flexible enough to support project progress and not impose artificial restrictions based on software rules.
The results
Using OnSite Completions has given the joint venture project a better understanding of their progress, with resulting efficiencies realized across the board.