[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"case-study-en-roi-analysis-octave-loop-material-readiness-offshore-fabrication-services-site-published":3,"related-case-study-pages-en-roi-analysis-octave-loop-material-readiness-offshore-fabrication-services-site":581,"related-resource-case-study-files-en-roi-analysis-octave-loop-material-readiness-offshore-fabrication-services-site":629},{"type":4,"data":5},"page",{"sys":6,"metadata":26,"fields":48},{"space":7,"id":12,"type":13,"createdAt":14,"updatedAt":15,"environment":16,"publishedVersion":20,"revision":21,"contentType":22},{"sys":8},{"type":9,"linkType":10,"id":11},"Link","Space","mnlyapxnu8ls","7votSmcMKIhQTqhYnRRgYT","Entry","2026-06-01T19:27:56.735Z","2026-06-01T19:28:48.429Z",{"sys":17},{"id":18,"type":9,"linkType":19},"master","Environment",24,2,{"sys":23},{"type":9,"linkType":24,"id":25},"ContentType","caseStudy",{"tags":27,"concepts":28},[],[29,33,36,39,42,45],{"sys":30},{"type":9,"linkType":31,"id":32},"TaxonomyConcept","2Hv0HqX0FEkpzSxMgTEJI7",{"sys":34},{"type":9,"linkType":31,"id":35},"3GHbAFOHkhZwiTRqu2icBY",{"sys":37},{"type":9,"linkType":31,"id":38},"3RMMO69W8WTDMqUPld1Fpb",{"sys":40},{"type":9,"linkType":31,"id":41},"4OLzI1zzOWVL3hABFkJoa3",{"sys":43},{"type":9,"linkType":31,"id":44},"4WzW7mQiASXieAQnOIUE9N",{"sys":46},{"type":9,"linkType":31,"id":47},"6sRdzAhORpuVF7G42LFYQ4",{"internalTitle":49,"title":49,"slug":50,"hidePageFromSearchEnginesNoindex":51,"excludeLinksFromSearchRankingsNofollow":51,"headline":49,"cta":52,"backgroundImageFrontify":71,"displayBreadcrumbs":70,"caseStudyDetailBody":192,"cardDisplayImage":525},"ROI analysis: Octave Loop Material Readiness offshore fabrication services site","roi-analysis-octave-loop-material-readiness-offshore-fabrication-services-site",false,{"sys":53,"metadata":64,"fields":67},{"space":54,"id":56,"type":13,"createdAt":57,"updatedAt":57,"environment":58,"publishedVersion":21,"revision":60,"contentType":61},{"sys":55},{"type":9,"linkType":10,"id":11},"335J71BBq0PlSvvczf3kmI","2026-06-01T19:23:09.242Z",{"sys":59},{"id":18,"type":9,"linkType":19},1,{"sys":62},{"type":9,"linkType":24,"id":63},"ut3ExternalLink",{"tags":65,"concepts":66},[],[],{"linkTitle":68,"url":69,"openInNewTab":70},"Download Case Study","https:\u002F\u002Fmedia.ffycdn.net\u002Fus\u002Foctave\u002Fd\u002Fe86273e965ea49c78dd77355a3d7dd44",true,[72],{"id":73,"ext":74,"src":75,"name":76,"tags":77,"type":177,"title":178,"width":179,"height":180,"created":181,"licenses":182,"copyright":183,"appVersion":186,"focalPoint":187,"description":188,"dynamic_url":189,"generic_url":190,"preview_url":75,"metadataValues":191},"eyJpZGVudGlmaWVyIjozMjY3LCJ0eXBlIjoiYXNzZXQifQ==","jpg","https:\u002F\u002Fmedia.ffycdn.net\u002Fus\u002Foctave\u002FifiGkQVAUPHX8VhqBqE8.jpg","AdobeStock_1298534091_edit.jpg",[78,81,83,85,87,89,91,93,95,97,99,101,103,105,107,109,111,113,115,117,119,121,123,125,127,129,131,133,135,137,139,141,143,145,147,149,151,153,155,157,159,161,163,165,167,169,171,173,175],{"value":79,"source":80},"business","MANUAL",{"value":82,"source":80},"check",{"value":84,"source":80},"construction",{"value":86,"source":80},"control",{"value":88,"source":80},"energy",{"value":90,"source":80},"engineer",{"value":92,"source":80},"engineering",{"value":94,"source":80},"equipment",{"value":96,"source":80},"factory",{"value":98,"source":80},"flowing",{"value":100,"source":80},"gas",{"value":102,"source":80},"helmet",{"value":104,"source":80},"industrial",{"value":106,"source":80},"industry",{"value":108,"source":80},"inspection",{"value":110,"source":80},"inspector",{"value":112,"source":80},"instrument",{"value":114,"source":80},"leak",{"value":116,"source":80},"maintenance",{"value":118,"source":80},"man",{"value":120,"source":80},"manufacturing",{"value":122,"source":80},"mechanic",{"value":124,"source":80},"mechanical",{"value":126,"source":80},"metal",{"value":128,"source":80},"occupation",{"value":130,"source":80},"oil",{"value":132,"source":80},"people",{"value":134,"source":80},"pipe",{"value":136,"source":80},"pipeline",{"value":138,"source":80},"pipelines",{"value":140,"source":80},"plant",{"value":142,"source":80},"platform",{"value":144,"source":80},"pressure",{"value":146,"source":80},"production",{"value":148,"source":80},"pump",{"value":150,"source":80},"record",{"value":152,"source":80},"refinery",{"value":154,"source":80},"repair",{"value":156,"source":80},"rig",{"value":158,"source":80},"rust",{"value":160,"source":80},"safety",{"value":162,"source":80},"site",{"value":164,"source":80},"steel",{"value":166,"source":80},"technician",{"value":168,"source":80},"technology",{"value":170,"source":80},"valve",{"value":172,"source":80},"visual",{"value":174,"source":80},"welding",{"value":176,"source":80},"work","Image","AdobeStock_1298534091_edit",5697,3204,"2026-02-10T20:18:15.000+00:00",[],{"notice":184,"status":185},"chitsanupong_cpk@hotmail.com\ntel.+66892431140","UNKNOWN","2.0.0",null,"Male worker inspection at steel long pipes and pipe elbow in station oil factory during refinery valve of visual check record pipeline tank oil and gas","https:\u002F\u002Fmedia.ffycdn.net\u002Fus\u002Foctave\u002Fd\u002F1af2d3a878c045e38373af4878ceef43","https:\u002F\u002Fbrand.octave.com\u002Fapi\u002Fasset\u002FeyJjbGllbnRJZCI6ImNvbnRlbnRmdWwiLCJpZCI6MzI2NywidGltZXN0YW1wIjoxNzgwMzQxODUyLCJ2ZXJzaW9uIjoxNzcwNzU0Njk1fQ:octave:UcM0rAQx9l1Hvr_l5vVlfipHP6GoIQMzUwYHRfrqooQ\u002Fdownload",[],{"nodeType":193,"data":194,"content":195},"document",{},[196,205,213,220,227,272,279,286,309,316,349,356,363,371,378,385,392,465,472,479,486,519],{"nodeType":197,"data":198,"content":199},"heading-2",{},[200],{"nodeType":201,"value":202,"marks":203,"data":204},"text","Challenges",[],{},{"nodeType":206,"data":207,"content":208},"paragraph",{},[209],{"nodeType":201,"value":210,"marks":211,"data":212},"Octave Loop Material Readiness (formerly Jovix) was deployed in 2011 at an EPC firm’s offshore construction site in coastal Texas. Functionality included material receipt, request, location and issue. Savings from Loop Material Readiness track and trace led it to add preventative maintenance and inspections (PMI) functionality. Below, learn more details about cost savings generated by efficiency, accuracy and a reduction in direct and indirect work hours.",[],{},{"nodeType":197,"data":214,"content":215},{},[216],{"nodeType":201,"value":217,"marks":218,"data":219},"Jobsite challenges",[],{},{"nodeType":206,"data":221,"content":222},{},[223],{"nodeType":201,"value":224,"marks":225,"data":226},"",[],{},{"nodeType":228,"data":229,"content":230},"unordered-list",{},[231,242,252,262],{"nodeType":232,"data":233,"content":234},"list-item",{},[235],{"nodeType":206,"data":236,"content":237},{},[238],{"nodeType":201,"value":239,"marks":240,"data":241},"Time to locate a material: 45 minutes at $65 per hour (average)",[],{},{"nodeType":232,"data":243,"content":244},{},[245],{"nodeType":206,"data":246,"content":247},{},[248],{"nodeType":201,"value":249,"marks":250,"data":251},"0.2% of materials were lost;",[],{},{"nodeType":232,"data":253,"content":254},{},[255],{"nodeType":206,"data":256,"content":257},{},[258],{"nodeType":201,"value":259,"marks":260,"data":261},"re-procurement at $2,000 per spool (average)",[],{},{"nodeType":232,"data":263,"content":264},{},[265],{"nodeType":206,"data":266,"content":267},{},[268],{"nodeType":201,"value":269,"marks":270,"data":271},"0.1% of owner-furnished equipment was lost; replacement at $4,000 each (average)",[],{},{"nodeType":197,"data":273,"content":274},{},[275],{"nodeType":201,"value":276,"marks":277,"data":278},"Solution",[],{},{"nodeType":206,"data":280,"content":281},{},[282],{"nodeType":201,"value":283,"marks":284,"data":285},"Analytics and reporting within Octave Loop Material Readiness pulled the following information:",[],{},{"nodeType":228,"data":287,"content":288},{},[289,299],{"nodeType":232,"data":290,"content":291},{},[292],{"nodeType":206,"data":293,"content":294},{},[295],{"nodeType":201,"value":296,"marks":297,"data":298},"71,624 pieces tagged with active RFID; associated material data entered into Loop Material Readiness",[],{},{"nodeType":232,"data":300,"content":301},{},[302],{"nodeType":206,"data":303,"content":304},{},[305],{"nodeType":201,"value":306,"marks":307,"data":308},"66,173 tagged materials were picked in the first 4.5 years of Loop Material Readiness deployment; not a single tagged asset was lost",[],{},{"nodeType":206,"data":310,"content":311},{},[312],{"nodeType":201,"value":313,"marks":314,"data":315},"Analysis of the data resulted in the following conclusions:",[],{},{"nodeType":228,"data":317,"content":318},{},[319,329,339],{"nodeType":232,"data":320,"content":321},{},[322],{"nodeType":206,"data":323,"content":324},{},[325],{"nodeType":201,"value":326,"marks":327,"data":328},"Client saved 0.667 work hours for each material located",[],{},{"nodeType":232,"data":330,"content":331},{},[332],{"nodeType":206,"data":333,"content":334},{},[335],{"nodeType":201,"value":336,"marks":337,"data":338},"0.667 work hours reduced per 66,000 materials saved the client $2,867,496",[],{},{"nodeType":232,"data":340,"content":341},{},[342],{"nodeType":206,"data":343,"content":344},{},[345],{"nodeType":201,"value":346,"marks":347,"data":348},"With zero assets lost, client avoided $264,692 in re-procurement costs",[],{},{"nodeType":197,"data":350,"content":351},{},[352],{"nodeType":201,"value":353,"marks":354,"data":355},"Savings through added functionality",[],{},{"nodeType":206,"data":357,"content":358},{},[359],{"nodeType":201,"value":360,"marks":361,"data":362},"The time and cost savings realized through the Loop Material Readiness track and trace implementation were used to justify expanding the implementation into other processes and activities on the project.",[],{},{"nodeType":364,"data":365,"content":366},"heading-3",{},[367],{"nodeType":201,"value":368,"marks":369,"data":370},"Savings beyond location",[],{},{"nodeType":206,"data":372,"content":373},{},[374],{"nodeType":201,"value":375,"marks":376,"data":377},"The initial investment in hardware had already been accounted for and justified by savings realized in material location. Therefore, it only made sense to incorporate additional Loop Material Readiness functionality that could result in more cost savings. The additional investment would be much lower than the initial commitment, and total savings would be significant.",[],{},{"nodeType":364,"data":379,"content":380},{},[381],{"nodeType":201,"value":382,"marks":383,"data":384},"Preventative maintenance and inspections",[],{},{"nodeType":206,"data":386,"content":387},{},[388],{"nodeType":201,"value":389,"marks":390,"data":391},"The path forward at this facility included PMI functionality, and the implementation proved so successful that Loop Material Readiness became the district standard for PMI activities. It’s now sold as a value-added service in this fabricator’s tool kit. Unlike most PMI solutions, Loop Material Readiness also features preservation functionality. Coupling two functions drives efficiency by enabling material activities, such as receipt, to automatically trigger an inspection task. Preservation activities automatically update materials management information. For example, if an asset fails inspection, Loop Material Readiness can automatically place it into quarantine status. With Loop Material Readiness PMI functionality, the client was able to perform the following tasks:",[],{},{"nodeType":228,"data":393,"content":394},{},[395,405,415,425,435,445,455],{"nodeType":232,"data":396,"content":397},{},[398],{"nodeType":206,"data":399,"content":400},{},[401],{"nodeType":201,"value":402,"marks":403,"data":404},"Build inspection templates",[],{},{"nodeType":232,"data":406,"content":407},{},[408],{"nodeType":206,"data":409,"content":410},{},[411],{"nodeType":201,"value":412,"marks":413,"data":414},"Upload supplier requirements",[],{},{"nodeType":232,"data":416,"content":417},{},[418],{"nodeType":206,"data":419,"content":420},{},[421],{"nodeType":201,"value":422,"marks":423,"data":424},"Create recurring inspections",[],{},{"nodeType":232,"data":426,"content":427},{},[428],{"nodeType":206,"data":429,"content":430},{},[431],{"nodeType":201,"value":432,"marks":433,"data":434},"Set reminders and alerts",[],{},{"nodeType":232,"data":436,"content":437},{},[438],{"nodeType":206,"data":439,"content":440},{},[441],{"nodeType":201,"value":442,"marks":443,"data":444},"Assign inspection to a user",[],{},{"nodeType":232,"data":446,"content":447},{},[448],{"nodeType":206,"data":449,"content":450},{},[451],{"nodeType":201,"value":452,"marks":453,"data":454},"Locate equipment requiring maintenance",[],{},{"nodeType":232,"data":456,"content":457},{},[458],{"nodeType":206,"data":459,"content":460},{},[461],{"nodeType":201,"value":462,"marks":463,"data":464},"Collect photos and digital signatures",[],{},{"nodeType":206,"data":466,"content":467},{},[468],{"nodeType":201,"value":469,"marks":470,"data":471},"PMI with the Loop Material Readiness solution decreased indirect labor costs by reducing material location time and removing manual data entry. Loop Material Readiness also streamlined scheduling and reporting, eliminating the need for personnel dedicated to those functions.",[],{},{"nodeType":364,"data":473,"content":474},{},[475],{"nodeType":201,"value":476,"marks":477,"data":478},"Additional functionality",[],{},{"nodeType":206,"data":480,"content":481},{},[482],{"nodeType":201,"value":483,"marks":484,"data":485},"The client also incorporated the following value-added services:",[],{},{"nodeType":228,"data":487,"content":488},{},[489,499,509],{"nodeType":232,"data":490,"content":491},{},[492],{"nodeType":206,"data":493,"content":494},{},[495],{"nodeType":201,"value":496,"marks":497,"data":498},"Enterprise resource planning (ERP) tool integration",[],{},{"nodeType":232,"data":500,"content":501},{},[502],{"nodeType":206,"data":503,"content":504},{},[505],{"nodeType":201,"value":506,"marks":507,"data":508},"Fabrication tracking with active and passive RFID tags",[],{},{"nodeType":232,"data":510,"content":511},{},[512],{"nodeType":206,"data":513,"content":514},{},[515],{"nodeType":201,"value":516,"marks":517,"data":518},"Steel fabrication software integration",[],{},{"nodeType":206,"data":520,"content":521},{},[522],{"nodeType":201,"value":224,"marks":523,"data":524},[],{},[526],{"id":73,"ext":74,"src":75,"name":76,"tags":527,"type":177,"title":178,"width":179,"height":180,"created":181,"licenses":577,"copyright":578,"appVersion":186,"focalPoint":187,"description":188,"dynamic_url":189,"generic_url":579,"preview_url":75,"metadataValues":580},[528,529,530,531,532,533,534,535,536,537,538,539,540,541,542,543,544,545,546,547,548,549,550,551,552,553,554,555,556,557,558,559,560,561,562,563,564,565,566,567,568,569,570,571,572,573,574,575,576],{"value":79,"source":80},{"value":82,"source":80},{"value":84,"source":80},{"value":86,"source":80},{"value":88,"source":80},{"value":90,"source":80},{"value":92,"source":80},{"value":94,"source":80},{"value":96,"source":80},{"value":98,"source":80},{"value":100,"source":80},{"value":102,"source":80},{"value":104,"source":80},{"value":106,"source":80},{"value":108,"source":80},{"value":110,"source":80},{"value":112,"source":80},{"value":114,"source":80},{"value":116,"source":80},{"value":118,"source":80},{"value":120,"source":80},{"value":122,"source":80},{"value":124,"source":80},{"value":126,"source":80},{"value":128,"source":80},{"value":130,"source":80},{"value":132,"source":80},{"value":134,"source":80},{"value":136,"source":80},{"value":138,"source":80},{"value":140,"source":80},{"value":142,"source":80},{"value":144,"source":80},{"value":146,"source":80},{"value":148,"source":80},{"value":150,"source":80},{"value":152,"source":80},{"value":154,"source":80},{"value":156,"source":80},{"value":158,"source":80},{"value":160,"source":80},{"value":162,"source":80},{"value":164,"source":80},{"value":166,"source":80},{"value":168,"source":80},{"value":170,"source":80},{"value":172,"source":80},{"value":174,"source":80},{"value":176,"source":80},[],{"notice":184,"status":185},"https:\u002F\u002Fbrand.octave.com\u002Fapi\u002Fasset\u002FeyJjbGllbnRJZCI6ImNvbnRlbnRmdWwiLCJpZCI6MzI2NywidGltZXN0YW1wIjoxNzgwMzQxODc0LCJ2ZXJzaW9uIjoxNzcwNzU0Njk1fQ:octave:tV_J-pWFjIcy7NFDMfJTXfI4GesHFOcULwXhR5fbrrs\u002Fdownload",[],[582,599,614],{"id":583,"image":584,"imgAlt":585,"headline":586,"copy":224,"tags":587,"url":588,"sys":589,"locale":598},"35aaCGYoP52G27c4E2Zk1v","https:\u002F\u002Fmedia.ffycdn.net\u002Fus\u002Foctave\u002Fd\u002FFkbCJPoywLfKkoun","Sketch of piping design mixed with industrial equipment photo","OLG Engineering ensures compliance with site standards and continued plant operation using Octave Aspect Pipe Stress",[],"\u002Flearn\u002Fresources\u002Fcase-studies\u002Folg-engineering-ensures-compliance-using-octave-aspect-pipe-stress",{"space":590,"id":583,"type":13,"createdAt":592,"updatedAt":592,"environment":593,"publishedVersion":595,"revision":60,"contentType":596,"locale":598},{"sys":591},{"type":9,"linkType":10,"id":11},"2026-06-22T18:22:08.334Z",{"sys":594},{"id":18,"type":9,"linkType":19},17,{"sys":597},{"type":9,"linkType":24,"id":25},"en",{"id":600,"image":601,"imgAlt":602,"headline":603,"copy":224,"tags":604,"url":605,"sys":606,"locale":598},"13V2cWZY1MYfXajjVtRrdM","https:\u002F\u002Fmedia.ffycdn.net\u002Fus\u002Foctave\u002Fd\u002FmajzgUVHAc7uoa6x","Asian engineer with hardhat using  tablet pc computer inspecting and working at construction site","Nuclear project reports zero lost materials with Octave Loop Material Readiness",[],"\u002Flearn\u002Fresources\u002Fcase-studies\u002Fnuclear-project-reports-zero-lost-materials-with-octave-loop-material-readiness",{"space":607,"id":600,"type":13,"createdAt":609,"updatedAt":609,"environment":610,"publishedVersion":595,"revision":60,"contentType":612,"locale":598},{"sys":608},{"type":9,"linkType":10,"id":11},"2026-06-22T18:04:35.301Z",{"sys":611},{"id":18,"type":9,"linkType":19},{"sys":613},{"type":9,"linkType":24,"id":25},{"id":615,"image":584,"imgAlt":585,"headline":616,"copy":224,"tags":617,"url":618,"sys":619,"locale":598},"5irHvo9xHAVAfqdjrrxoaD","TUREFEN advances in pharmaceutical piping solutions with Octave Aspect Pipe Stress",[],"\u002Flearn\u002Fresources\u002Fcase-studies\u002Fturefen-advances-with-octave-aspect-pipe-stress",{"space":620,"id":615,"type":13,"createdAt":622,"updatedAt":623,"environment":624,"publishedVersion":626,"revision":21,"contentType":627,"locale":598},{"sys":621},{"type":9,"linkType":10,"id":11},"2026-06-17T17:49:02.007Z","2026-06-17T17:49:32.852Z",{"sys":625},{"id":18,"type":9,"linkType":19},21,{"sys":628},{"type":9,"linkType":24,"id":25},[]]