[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"case-study-ko-nuclear-project-reports-zero-lost-materials-with-octave-loop-material-readiness-published":3,"related-case-study-pages-ko-nuclear-project-reports-zero-lost-materials-with-octave-loop-material-readiness":494,"related-resource-case-study-files-ko-nuclear-project-reports-zero-lost-materials-with-octave-loop-material-readiness":543},{"type":4,"data":5},"page",{"sys":6,"metadata":25,"fields":47,"_fallbackInfo":491},{"space":7,"id":12,"type":13,"createdAt":14,"updatedAt":14,"environment":15,"publishedVersion":19,"revision":20,"contentType":21},{"sys":8},{"type":9,"linkType":10,"id":11},"Link","Space","mnlyapxnu8ls","13V2cWZY1MYfXajjVtRrdM","Entry","2026-06-22T18:04:35.301Z",{"sys":16},{"id":17,"type":9,"linkType":18},"master","Environment",17,1,{"sys":22},{"type":9,"linkType":23,"id":24},"ContentType","caseStudy",{"tags":26,"concepts":27},[],[28,32,35,38,41,44],{"sys":29},{"type":9,"linkType":30,"id":31},"TaxonomyConcept","2Hv0HqX0FEkpzSxMgTEJI7",{"sys":33},{"type":9,"linkType":30,"id":34},"3GHbAFOHkhZwiTRqu2icBY",{"sys":36},{"type":9,"linkType":30,"id":37},"3RMMO69W8WTDMqUPld1Fpb",{"sys":39},{"type":9,"linkType":30,"id":40},"4OLzI1zzOWVL3hABFkJoa3",{"sys":42},{"type":9,"linkType":30,"id":43},"4WzW7mQiASXieAQnOIUE9N",{"sys":45},{"type":9,"linkType":30,"id":46},"6sRdzAhORpuVF7G42LFYQ4",{"internalTitle":48,"title":48,"slug":49,"hidePageFromSearchEnginesNoindex":50,"excludeLinksFromSearchRankingsNofollow":50,"headline":48,"cta":51,"backgroundImageFrontify":70,"displayBreadcrumbs":69,"caseStudyDetailBody":193,"cardDisplayImage":434},"Nuclear project reports zero lost materials with Octave Loop Material Readiness","nuclear-project-reports-zero-lost-materials-with-octave-loop-material-readiness",false,{"sys":52,"metadata":63,"fields":66},{"space":53,"id":55,"type":13,"createdAt":56,"updatedAt":56,"environment":57,"publishedVersion":59,"revision":20,"contentType":60},{"sys":54},{"type":9,"linkType":10,"id":11},"73b5vwyeP0KmxUzEDSVpNT","2026-06-22T17:59:09.981Z",{"sys":58},{"id":17,"type":9,"linkType":18},3,{"sys":61},{"type":9,"linkType":23,"id":62},"ut3ExternalLink",{"tags":64,"concepts":65},[],[],{"linkTitle":67,"url":68,"openInNewTab":69},"Download Case Study","https:\u002F\u002Fmedia.ffycdn.net\u002Fus\u002Foctave\u002Fd\u002Fd2e274c9e86e40b48d8f74832e0aa68c",true,[71],{"id":72,"ext":73,"src":74,"name":75,"tags":76,"type":178,"title":179,"width":180,"height":181,"created":182,"licenses":183,"copyright":184,"appVersion":187,"focalPoint":188,"description":189,"dynamic_url":190,"generic_url":191,"preview_url":74,"metadataValues":192},"eyJpZGVudGlmaWVyIjozMjYyLCJ0eXBlIjoiYXNzZXQifQ==","jpg","https:\u002F\u002Fmedia.ffycdn.net\u002Fus\u002Foctave\u002FP8rmUQkD8wRrzX2fkJk9.jpg","AdobeStock_183194041_edit.jpg",[77,80,82,84,86,88,90,92,94,96,98,100,102,104,106,108,110,112,114,116,118,120,122,124,126,128,130,132,134,136,138,140,142,144,146,148,150,152,154,156,158,160,162,164,166,168,170,172,174,176],{"value":78,"source":79},"architect","MANUAL",{"value":81,"source":79},"architecture",{"value":83,"source":79},"asia",{"value":85,"source":79},"asian",{"value":87,"source":79},"background",{"value":89,"source":79},"blueprint",{"value":91,"source":79},"builder",{"value":93,"source":79},"building",{"value":95,"source":79},"bulldozer",{"value":97,"source":79},"business",{"value":99,"source":79},"businessman",{"value":101,"source":79},"computer",{"value":103,"source":79},"construction",{"value":105,"source":79},"contractor",{"value":107,"source":79},"crane",{"value":109,"source":79},"design",{"value":111,"source":79},"development",{"value":113,"source":79},"drawing",{"value":115,"source":79},"energy",{"value":117,"source":79},"engineer",{"value":119,"source":79},"engineering",{"value":121,"source":79},"engineers",{"value":123,"source":79},"equipment",{"value":125,"source":79},"foreman",{"value":127,"source":79},"hand",{"value":129,"source":79},"hardhat",{"value":131,"source":79},"helmet",{"value":133,"source":79},"industrial",{"value":135,"source":79},"industry",{"value":137,"source":79},"job",{"value":139,"source":79},"laptop",{"value":141,"source":79},"man",{"value":143,"source":79},"manager",{"value":145,"source":79},"office",{"value":147,"source":79},"people",{"value":149,"source":79},"plan",{"value":151,"source":79},"plant",{"value":153,"source":79},"power",{"value":155,"source":79},"professional",{"value":157,"source":79},"project",{"value":159,"source":79},"safety",{"value":161,"source":79},"security",{"value":163,"source":79},"site",{"value":165,"source":79},"steel",{"value":167,"source":79},"tablet",{"value":169,"source":79},"technology",{"value":171,"source":79},"tractor",{"value":173,"source":79},"work",{"value":175,"source":79},"worker",{"value":177,"source":79},"working","Image","AdobeStock_183194041_edit",3205,1804,"2026-02-10T20:18:09.000+00:00",[],{"notice":185,"status":186},"","UNKNOWN","2.0.0",null,"Asian engineer with hardhat using  tablet pc computer inspecting and working at construction site","https:\u002F\u002Fmedia.ffycdn.net\u002Fus\u002Foctave\u002Fd\u002FmajzgUVHAc7uoa6x","https:\u002F\u002Fbrand.octave.com\u002Fapi\u002Fasset\u002FeyJjbGllbnRJZCI6ImNvbnRlbnRmdWwiLCJpZCI6MzI2MiwidGltZXN0YW1wIjoxNzgyMTUxMjk4LCJ2ZXJzaW9uIjoxNzcwNzU0Njg5fQ:octave:HwCey8E7Ql8ArRfT-GLwryzcraXRker7QeKYR7h1n6k\u002Fdownload",[],{"nodeType":194,"data":195,"content":196},"document",{},[197,206,214,249,257,264,298,305,388,395,428],{"nodeType":198,"data":199,"content":200},"paragraph",{},[201],{"nodeType":202,"value":203,"marks":204,"data":205},"text","This nuclear project is being funded by a leading energy provider and is under contract with two EPC firms working together as consortium partners. Services in scope include the engineering, procurement, construction and commissioning of two nuclear reactors - the first nuclear construction in the United States in more than 30 years.",[],{},{"nodeType":207,"data":208,"content":209},"heading-2",{},[210],{"nodeType":202,"value":211,"marks":212,"data":213},"Challenges",[],{},{"nodeType":215,"data":216,"content":217},"unordered-list",{},[218,229,239],{"nodeType":219,"data":220,"content":221},"list-item",{},[222],{"nodeType":198,"data":223,"content":224},{},[225],{"nodeType":202,"value":226,"marks":227,"data":228},"No systematic way to track over 70,000 materials",[],{},{"nodeType":219,"data":230,"content":231},{},[232],{"nodeType":198,"data":233,"content":234},{},[235],{"nodeType":202,"value":236,"marks":237,"data":238},"Material location times were too high",[],{},{"nodeType":219,"data":240,"content":241},{},[242],{"nodeType":198,"data":243,"content":244},{},[245],{"nodeType":202,"value":246,"marks":247,"data":248},"Need to mitigate re-procurement",[],{},{"nodeType":250,"data":251,"content":252},"heading-1",{},[253],{"nodeType":202,"value":254,"marks":255,"data":256},"The solution",[],{},{"nodeType":198,"data":258,"content":259},{},[260],{"nodeType":202,"value":261,"marks":262,"data":263},"The Loop Material Readiness deployment consisted of the following elements:",[],{},{"nodeType":215,"data":265,"content":266},{},[267,283],{"nodeType":219,"data":268,"content":269},{},[270],{"nodeType":198,"data":271,"content":272},{},[273,279],{"nodeType":202,"value":274,"marks":275,"data":278},"Mobile Devices: ",[276],{"type":277},"bold",{},{"nodeType":202,"value":280,"marks":281,"data":282},"Handheld devices used to define GPS coordinates for active RFID tags and to sync collected data with the Loop Material Readiness server",[],{},{"nodeType":219,"data":284,"content":285},{},[286],{"nodeType":198,"data":287,"content":288},{},[289,294],{"nodeType":202,"value":290,"marks":291,"data":293},"Active RFID Tags: ",[292],{"type":277},{},{"nodeType":202,"value":295,"marks":296,"data":297},"Suppliers and fabricators tag materials at their facilities which sends status and location data downstream through issue to construction",[],{},{"nodeType":198,"data":299,"content":300},{},[301],{"nodeType":202,"value":302,"marks":303,"data":304},"Loop Material Readiness was used to track the following types of assets:",[],{},{"nodeType":215,"data":306,"content":307},{},[308,318,328,338,348,358,368,378],{"nodeType":219,"data":309,"content":310},{},[311],{"nodeType":198,"data":312,"content":313},{},[314],{"nodeType":202,"value":315,"marks":316,"data":317},"Pipe spools",[],{},{"nodeType":219,"data":319,"content":320},{},[321],{"nodeType":198,"data":322,"content":323},{},[324],{"nodeType":202,"value":325,"marks":326,"data":327},"Structural steel",[],{},{"nodeType":219,"data":329,"content":330},{},[331],{"nodeType":198,"data":332,"content":333},{},[334],{"nodeType":202,"value":335,"marks":336,"data":337},"Modules",[],{},{"nodeType":219,"data":339,"content":340},{},[341],{"nodeType":198,"data":342,"content":343},{},[344],{"nodeType":202,"value":345,"marks":346,"data":347},"Embeds",[],{},{"nodeType":219,"data":349,"content":350},{},[351],{"nodeType":198,"data":352,"content":353},{},[354],{"nodeType":202,"value":355,"marks":356,"data":357},"Rebar",[],{},{"nodeType":219,"data":359,"content":360},{},[361],{"nodeType":198,"data":362,"content":363},{},[364],{"nodeType":202,"value":365,"marks":366,"data":367},"All supplier materials",[],{},{"nodeType":219,"data":369,"content":370},{},[371],{"nodeType":198,"data":372,"content":373},{},[374],{"nodeType":202,"value":375,"marks":376,"data":377},"Supplier equipment",[],{},{"nodeType":219,"data":379,"content":380},{},[381],{"nodeType":198,"data":382,"content":383},{},[384],{"nodeType":202,"value":385,"marks":386,"data":387},"Various bulk items",[],{},{"nodeType":207,"data":389,"content":390},{},[391],{"nodeType":202,"value":392,"marks":393,"data":394},"Results",[],{},{"nodeType":215,"data":396,"content":397},{},[398,408,418],{"nodeType":219,"data":399,"content":400},{},[401],{"nodeType":198,"data":402,"content":403},{},[404],{"nodeType":202,"value":405,"marks":406,"data":407},"Reduction in material location time by a factor of eight",[],{},{"nodeType":219,"data":409,"content":410},{},[411],{"nodeType":198,"data":412,"content":413},{},[414],{"nodeType":202,"value":415,"marks":416,"data":417},"Zero lost spools over a two-year period",[],{},{"nodeType":219,"data":419,"content":420},{},[421],{"nodeType":198,"data":422,"content":423},{},[424],{"nodeType":202,"value":425,"marks":426,"data":427},"Construction’s use of Loop Material Readiness provided material visibility and reduced the number of requests and inquiries to the materials management team",[],{},{"nodeType":198,"data":429,"content":430},{},[431],{"nodeType":202,"value":185,"marks":432,"data":433},[],{},[435],{"id":72,"ext":73,"src":74,"name":75,"tags":436,"type":178,"title":179,"width":180,"height":181,"created":182,"licenses":487,"copyright":488,"appVersion":187,"focalPoint":188,"description":189,"dynamic_url":190,"generic_url":489,"preview_url":74,"metadataValues":490},[437,438,439,440,441,442,443,444,445,446,447,448,449,450,451,452,453,454,455,456,457,458,459,460,461,462,463,464,465,466,467,468,469,470,471,472,473,474,475,476,477,478,479,480,481,482,483,484,485,486],{"value":78,"source":79},{"value":81,"source":79},{"value":83,"source":79},{"value":85,"source":79},{"value":87,"source":79},{"value":89,"source":79},{"value":91,"source":79},{"value":93,"source":79},{"value":95,"source":79},{"value":97,"source":79},{"value":99,"source":79},{"value":101,"source":79},{"value":103,"source":79},{"value":105,"source":79},{"value":107,"source":79},{"value":109,"source":79},{"value":111,"source":79},{"value":113,"source":79},{"value":115,"source":79},{"value":117,"source":79},{"value":119,"source":79},{"value":121,"source":79},{"value":123,"source":79},{"value":125,"source":79},{"value":127,"source":79},{"value":129,"source":79},{"value":131,"source":79},{"value":133,"source":79},{"value":135,"source":79},{"value":137,"source":79},{"value":139,"source":79},{"value":141,"source":79},{"value":143,"source":79},{"value":145,"source":79},{"value":147,"source":79},{"value":149,"source":79},{"value":151,"source":79},{"value":153,"source":79},{"value":155,"source":79},{"value":157,"source":79},{"value":159,"source":79},{"value":161,"source":79},{"value":163,"source":79},{"value":165,"source":79},{"value":167,"source":79},{"value":169,"source":79},{"value":171,"source":79},{"value":173,"source":79},{"value":175,"source":79},{"value":177,"source":79},[],{"notice":185,"status":186},"https:\u002F\u002Fbrand.octave.com\u002Fapi\u002Fasset\u002FeyJjbGllbnRJZCI6ImNvbnRlbnRmdWwiLCJpZCI6MzI2MiwidGltZXN0YW1wIjoxNzgyMTUxMzEzLCJ2ZXJzaW9uIjoxNzcwNzU0Njg5fQ:octave:q4jhTlgiCfg3a7IEjtDaQrLEIk_r3jzu0mOM04v-Syw\u002Fdownload",[],{"usedFallback":69,"requestedLocale":492,"actualLocale":493},"ko","en",[495,510,526],{"id":496,"image":497,"imgAlt":498,"headline":499,"copy":185,"tags":500,"url":501,"sys":502,"locale":492},"35aaCGYoP52G27c4E2Zk1v","https:\u002F\u002Fmedia.ffycdn.net\u002Fus\u002Foctave\u002Fd\u002FFkbCJPoywLfKkoun","Sketch of piping design mixed with industrial equipment photo","OLG Engineering ensures compliance with site standards and continued plant operation using Octave Aspect Pipe Stress",[],"\u002Flearn\u002Fresources\u002Fcase-studies\u002Folg-engineering-ensures-compliance-using-octave-aspect-pipe-stress",{"space":503,"id":496,"type":13,"createdAt":505,"updatedAt":505,"environment":506,"publishedVersion":19,"revision":20,"contentType":508,"locale":492},{"sys":504},{"type":9,"linkType":10,"id":11},"2026-06-22T18:22:08.334Z",{"sys":507},{"id":17,"type":9,"linkType":18},{"sys":509},{"type":9,"linkType":23,"id":24},{"id":511,"image":497,"imgAlt":498,"headline":512,"copy":185,"tags":513,"url":514,"sys":515,"locale":492},"5irHvo9xHAVAfqdjrrxoaD","TUREFEN advances in pharmaceutical piping solutions with Octave Aspect Pipe Stress",[],"\u002Flearn\u002Fresources\u002Fcase-studies\u002Fturefen-advances-with-octave-aspect-pipe-stress",{"space":516,"id":511,"type":13,"createdAt":518,"updatedAt":519,"environment":520,"publishedVersion":522,"revision":523,"contentType":524,"locale":492},{"sys":517},{"type":9,"linkType":10,"id":11},"2026-06-17T17:49:02.007Z","2026-06-17T17:49:32.852Z",{"sys":521},{"id":17,"type":9,"linkType":18},21,2,{"sys":525},{"type":9,"linkType":23,"id":24},{"id":527,"image":528,"imgAlt":529,"headline":530,"copy":185,"tags":531,"url":532,"sys":533,"locale":492},"6xWOtMObXcnOBa8Q1b3cZc","https:\u002F\u002Fmedia.ffycdn.net\u002Fus\u002Foctave\u002Fd\u002FQoiyT6dCx656bcjB","AdobeStock_382083726","Bouygues Construction tracks, standardizes and accelerates equipment management with Attune EAM",[],"\u002Flearn\u002Fresources\u002Fcase-studies\u002Fbouygues-construction-tracks-standardizes-and-accelerates-equipment-management-with-attune-eam",{"space":534,"id":527,"type":13,"createdAt":536,"updatedAt":537,"environment":538,"publishedVersion":540,"revision":523,"contentType":541,"locale":492},{"sys":535},{"type":9,"linkType":10,"id":11},"2026-05-29T16:43:36.504Z","2026-06-12T15:10:59.046Z",{"sys":539},{"id":17,"type":9,"linkType":18},34,{"sys":542},{"type":9,"linkType":23,"id":24},[]]