[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"case-study-it-octave-onsite-completions-streamlines-operations-and-reduces-work-hours-in-qatars-north-field-east-lng-project-published":3,"related-case-study-pages-it-octave-onsite-completions-streamlines-operations-and-reduces-work-hours-in-qatars-north-field-east-lng-project":379,"related-resource-case-study-files-it-octave-onsite-completions-streamlines-operations-and-reduces-work-hours-in-qatars-north-field-east-lng-project":431},{"type":4,"data":5},"page",{"sys":6,"metadata":26,"fields":48,"_fallbackInfo":376},{"space":7,"id":12,"type":13,"createdAt":14,"updatedAt":15,"environment":16,"publishedVersion":20,"revision":21,"contentType":22},{"sys":8},{"type":9,"linkType":10,"id":11},"Link","Space","mnlyapxnu8ls","6wahJUkt9syPcxk0OsgRHA","Entry","2026-05-12T21:03:51.811Z","2026-05-12T21:05:34.536Z",{"sys":17},{"id":18,"type":9,"linkType":19},"master","Environment",17,2,{"sys":23},{"type":9,"linkType":24,"id":25},"ContentType","caseStudy",{"tags":27,"concepts":28},[],[29,33,36,39,42,45],{"sys":30},{"type":9,"linkType":31,"id":32},"TaxonomyConcept","2Hv0HqX0FEkpzSxMgTEJI7",{"sys":34},{"type":9,"linkType":31,"id":35},"3RMMO69W8WTDMqUPld1Fpb",{"sys":37},{"type":9,"linkType":31,"id":38},"4OLzI1zzOWVL3hABFkJoa3",{"sys":40},{"type":9,"linkType":31,"id":41},"4WzW7mQiASXieAQnOIUE9N",{"sys":43},{"type":9,"linkType":31,"id":44},"5EEU6DH2TDP0IzIpUAYY2A",{"sys":46},{"type":9,"linkType":31,"id":47},"IOeItpU9LA1QmMP6vRZlU",{"internalTitle":49,"title":49,"slug":50,"hidePageFromSearchEnginesNoindex":51,"excludeLinksFromSearchRankingsNofollow":51,"headline":49,"cta":52,"backgroundImageFrontify":72,"displayBreadcrumbs":71,"caseStudyDetailBody":193,"cardDisplayImage":320},"Octave OnSite Completions streamlines operations and reduces work hours in Qatar’s North Field East LNG project","octave-onsite-completions-streamlines-operations-and-reduces-work-hours-in-qatars-north-field-east-lng-project",false,{"sys":53,"metadata":65,"fields":68},{"space":54,"id":56,"type":13,"createdAt":57,"updatedAt":57,"environment":58,"publishedVersion":60,"revision":61,"contentType":62},{"sys":55},{"type":9,"linkType":10,"id":11},"4f9VBavHdcKQcNpPZWKQ7E","2026-05-12T21:02:06.566Z",{"sys":59},{"id":18,"type":9,"linkType":19},3,1,{"sys":63},{"type":9,"linkType":24,"id":64},"ut3ExternalLink",{"tags":66,"concepts":67},[],[],{"linkTitle":69,"url":70,"openInNewTab":71},"Download Case Study","https:\u002F\u002Fmedia.ffycdn.net\u002Fus\u002Foctave\u002Fd\u002F0d56f2afed2a4c9e93f58e096cf2ee1c",true,[73],{"id":74,"ext":75,"src":76,"name":77,"tags":78,"type":178,"title":179,"width":180,"height":181,"created":182,"licenses":183,"copyright":184,"appVersion":187,"focalPoint":188,"description":189,"dynamic_url":190,"generic_url":191,"preview_url":76,"metadataValues":192},"eyJpZGVudGlmaWVyIjo4MTUsInR5cGUiOiJhc3NldCJ9","jpeg","https:\u002F\u002Fmedia.ffycdn.net\u002Fus\u002Foctave\u002FGLCrFrnRJ9QdKmEvjxm6.jpeg","AdobeStock_595922327.jpeg",[79,82,84,86,88,90,92,94,96,98,100,102,104,106,108,110,112,114,116,118,120,122,124,126,128,130,132,134,136,138,140,142,144,146,148,150,152,154,156,158,160,162,164,166,168,170,172,174,176],{"value":80,"source":81},"architect","MANUAL",{"value":83,"source":81},"architecture",{"value":85,"source":81},"asian",{"value":87,"source":81},"bim",{"value":89,"source":81},"blueprint",{"value":91,"source":81},"builder",{"value":93,"source":81},"building",{"value":95,"source":81},"business",{"value":97,"source":81},"cement",{"value":99,"source":81},"civil",{"value":101,"source":81},"civil engineer",{"value":103,"source":81},"computer",{"value":105,"source":81},"concrete",{"value":107,"source":81},"construction",{"value":109,"source":81},"contractor",{"value":111,"source":81},"development",{"value":113,"source":81},"discussion",{"value":115,"source":81},"employee",{"value":117,"source":81},"engineer",{"value":119,"source":81},"engineering",{"value":121,"source":81},"foreman",{"value":123,"source":81},"group",{"value":125,"source":81},"helmet",{"value":127,"source":81},"industrial",{"value":129,"source":81},"industry",{"value":131,"source":81},"inspection",{"value":133,"source":81},"inspector",{"value":135,"source":81},"job",{"value":137,"source":81},"labour",{"value":139,"source":81},"labtop",{"value":141,"source":81},"man",{"value":143,"source":81},"manager",{"value":145,"source":81},"meeting",{"value":147,"source":81},"people",{"value":149,"source":81},"plan",{"value":151,"source":81},"professional",{"value":153,"source":81},"project",{"value":155,"source":81},"renovate",{"value":157,"source":81},"safety",{"value":159,"source":81},"site",{"value":161,"source":81},"structure",{"value":163,"source":81},"team",{"value":165,"source":81},"teamwork",{"value":167,"source":81},"technical",{"value":169,"source":81},"technician",{"value":171,"source":81},"together",{"value":173,"source":81},"work",{"value":175,"source":81},"worker",{"value":177,"source":81},"workplace","Image","AdobeStock_595922327",7952,5304,"2025-11-04T23:36:56.000+00:00",[],{"notice":185,"status":186},"","UNKNOWN","2.0.0",null,"Top view, Team engineer building inspection use tablet computer and blueprint working at construction site. Civil Engineer, Contractor and Architect discussing in construction site.","https:\u002F\u002Fmedia.ffycdn.net\u002Fus\u002Foctave\u002Fd\u002Fc2f7a37601fc43d4855de474f48a12b4","https:\u002F\u002Fbrand.octave.com\u002Fapi\u002Fasset\u002FeyJjbGllbnRJZCI6ImNvbnRlbnRmdWwiLCJpZCI6ODE1LCJ0aW1lc3RhbXAiOjE3Nzg2MTk3NTUsInZlcnNpb24iOjE3NjIyOTk0MTZ9:octave:X8tOfaJIXYBZ-cV5vOAPryFs9ofEcj--vsvd8cqRwlQ\u002Fdownload",[],{"nodeType":194,"data":195,"content":196},"document",{},[197,206,214,221,228,235,242,249,257,264,271,278,285,292,299,306,313],{"nodeType":198,"data":199,"content":200},"heading-2",{},[201],{"nodeType":202,"value":203,"marks":204,"data":205},"text","Identifying goals",[],{},{"nodeType":207,"data":208,"content":209},"paragraph",{},[210],{"nodeType":202,"value":211,"marks":212,"data":213},"Chiyoda Corporation, a frontrunner in the EPC industry, leverages the knowledge and technology from its extensive experience in plant construction to offer ‘Plant Lifecycle Engineering.’ This service supports every stage of a plant’s lifecycle, from business planning for process plants and social infrastructure development to design, procurement, construction, operations and maintenance.",[],{},{"nodeType":207,"data":215,"content":216},{},[217],{"nodeType":202,"value":218,"marks":219,"data":220},"This project involves the EPC (engineering, procurement and construction) work for an LNG plant and ancillary facilities with an annual production capacity of 32 million tons, (eight million tons x four trains). The plant will liquefy approximately six billion cubic feet per day of natural gas, newly processed from the eastern part of the Qatar North Field, the world’s largest single gas field. By executing this project, Qatar can increase its LNG production capacity from 77 million tons to 110 million tons annually.",[],{},{"nodeType":198,"data":222,"content":223},{},[224],{"nodeType":202,"value":225,"marks":226,"data":227},"Overcoming challenges",[],{},{"nodeType":207,"data":229,"content":230},{},[231],{"nodeType":202,"value":232,"marks":233,"data":234},"Regardless of the scale of the project, construction, commissioning and completion activities are executed on-site under site leadership. Operating often with limited real-time reporting, this makes it difficult for headquarters to grasp the exact execution status. As a result, it becomes hard for them to recognize when and where support is actually needed. Additionally, switching from a traditional paper-based approach to a fully digital execution was needed to improve productivity.",[],{},{"nodeType":207,"data":236,"content":237},{},[238],{"nodeType":202,"value":239,"marks":240,"data":241},"Key focus areas were the digitalization of the Inspection Test Record 9 (ITR), alongside the project completion dossier.",[],{},{"nodeType":198,"data":243,"content":244},{},[245],{"nodeType":202,"value":246,"marks":247,"data":248},"Realizing results",[],{},{"nodeType":250,"data":251,"content":252},"heading-3",{},[253],{"nodeType":202,"value":254,"marks":255,"data":256},"The cloud",[],{},{"nodeType":207,"data":258,"content":259},{},[260],{"nodeType":202,"value":261,"marks":262,"data":263},"With cloud adoption, construction, commissioning and completion status can now be monitored from headquarters, making both tool support and execution support easier. Remote status monitoring is also possible.",[],{},{"nodeType":250,"data":265,"content":266},{},[267],{"nodeType":202,"value":268,"marks":269,"data":270},"Digital execution",[],{},{"nodeType":207,"data":272,"content":273},{},[274],{"nodeType":202,"value":275,"marks":276,"data":277},"Workflows for ITR, punch list, preservation, etc., have been established, resulting in time savings.It is no longer necessary to create separate communication records for ITRs, reducing personnel needs and shortening closure time.Improved visibility of work status allows for easier identification of current issues.Managing all functions (tag, ITR, punch list, preservation, etc.) in a single database simplifies data management and saves time.Eliminating paper loss has removed the need for rework and storage space, reducing costs (no longer requiring20-foot containers).Time and personnel required for client handover documentation has been reduced.",[],{},{"nodeType":250,"data":279,"content":280},{},[281],{"nodeType":202,"value":282,"marks":283,"data":284},"Introduction of work packs",[],{},{"nodeType":207,"data":286,"content":287},{},[288],{"nodeType":202,"value":289,"marks":290,"data":291},"The introduction of Work Packs through AWP (Advanced Work Packaging) execution enables detailed tracking of construction status, making it easier to develop more precise strategies.",[],{},{"nodeType":250,"data":293,"content":294},{},[295],{"nodeType":202,"value":296,"marks":297,"data":298},"Data integration",[],{},{"nodeType":207,"data":300,"content":301},{},[302],{"nodeType":202,"value":303,"marks":304,"data":305},"Previously, report data preparation took time, but API-based automatic data retrieval has shortened report creation time.System-level data integration displays warnings for open ITRs and Punches during certificate closure, preventing oversights and reducing rework.",[],{},{"nodeType":198,"data":307,"content":308},{},[309],{"nodeType":202,"value":310,"marks":311,"data":312},"Moving forward",[],{},{"nodeType":207,"data":314,"content":315},{},[316],{"nodeType":202,"value":317,"marks":318,"data":319},"To expand the scope of execution using tablets, Chiyoda plans to improve the functionality of the mobile app and enhance the on-site environment.",[],{},[321],{"id":74,"ext":75,"src":76,"name":77,"tags":322,"type":178,"title":179,"width":180,"height":181,"created":182,"licenses":372,"copyright":373,"appVersion":187,"focalPoint":188,"description":189,"dynamic_url":190,"generic_url":374,"preview_url":76,"metadataValues":375},[323,324,325,326,327,328,329,330,331,332,333,334,335,336,337,338,339,340,341,342,343,344,345,346,347,348,349,350,351,352,353,354,355,356,357,358,359,360,361,362,363,364,365,366,367,368,369,370,371],{"value":80,"source":81},{"value":83,"source":81},{"value":85,"source":81},{"value":87,"source":81},{"value":89,"source":81},{"value":91,"source":81},{"value":93,"source":81},{"value":95,"source":81},{"value":97,"source":81},{"value":99,"source":81},{"value":101,"source":81},{"value":103,"source":81},{"value":105,"source":81},{"value":107,"source":81},{"value":109,"source":81},{"value":111,"source":81},{"value":113,"source":81},{"value":115,"source":81},{"value":117,"source":81},{"value":119,"source":81},{"value":121,"source":81},{"value":123,"source":81},{"value":125,"source":81},{"value":127,"source":81},{"value":129,"source":81},{"value":131,"source":81},{"value":133,"source":81},{"value":135,"source":81},{"value":137,"source":81},{"value":139,"source":81},{"value":141,"source":81},{"value":143,"source":81},{"value":145,"source":81},{"value":147,"source":81},{"value":149,"source":81},{"value":151,"source":81},{"value":153,"source":81},{"value":155,"source":81},{"value":157,"source":81},{"value":159,"source":81},{"value":161,"source":81},{"value":163,"source":81},{"value":165,"source":81},{"value":167,"source":81},{"value":169,"source":81},{"value":171,"source":81},{"value":173,"source":81},{"value":175,"source":81},{"value":177,"source":81},[],{"notice":185,"status":186},"https:\u002F\u002Fbrand.octave.com\u002Fapi\u002Fasset\u002FeyJjbGllbnRJZCI6ImNvbnRlbnRmdWwiLCJpZCI6ODE1LCJ0aW1lc3RhbXAiOjE3Nzg2MTk3NzgsInZlcnNpb24iOjE3NjIyOTk0MTZ9:octave:C7c2LSgVLxVDWeM6XhUdyD9HJbpIWzIlOjuHjCRW-js\u002Fdownload",[],{"usedFallback":71,"requestedLocale":377,"actualLocale":378},"it","en",[380,397,414],{"id":381,"image":382,"imgAlt":383,"headline":384,"copy":185,"tags":385,"url":386,"sys":387,"locale":377},"5irHvo9xHAVAfqdjrrxoaD","https:\u002F\u002Fmedia.ffycdn.net\u002Fus\u002Foctave\u002Fd\u002FFkbCJPoywLfKkoun","Sketch of piping design mixed with industrial equipment photo","TUREFEN advances in pharmaceutical piping solutions with Octave Aspect Pipe Stress",[],"\u002Flearn\u002Fresources\u002Fcase-studies\u002Fturefen-advances-with-octave-aspect-pipe-stress",{"space":388,"id":381,"type":13,"createdAt":390,"updatedAt":391,"environment":392,"publishedVersion":394,"revision":21,"contentType":395,"locale":377},{"sys":389},{"type":9,"linkType":10,"id":11},"2026-06-17T17:49:02.007Z","2026-06-17T17:49:32.852Z",{"sys":393},{"id":18,"type":9,"linkType":19},21,{"sys":396},{"type":9,"linkType":24,"id":25},{"id":398,"image":399,"imgAlt":400,"headline":401,"copy":185,"tags":402,"url":403,"sys":404,"locale":377},"6xWOtMObXcnOBa8Q1b3cZc","https:\u002F\u002Fmedia.ffycdn.net\u002Fus\u002Foctave\u002Fd\u002FQoiyT6dCx656bcjB","AdobeStock_382083726","Bouygues Construction tracks, standardizes and accelerates equipment management with Attune EAM",[],"\u002Flearn\u002Fresources\u002Fcase-studies\u002Fbouygues-construction-tracks-standardizes-and-accelerates-equipment-management-with-attune-eam",{"space":405,"id":398,"type":13,"createdAt":407,"updatedAt":408,"environment":409,"publishedVersion":411,"revision":21,"contentType":412,"locale":377},{"sys":406},{"type":9,"linkType":10,"id":11},"2026-05-29T16:43:36.504Z","2026-06-12T15:10:59.046Z",{"sys":410},{"id":18,"type":9,"linkType":19},34,{"sys":413},{"type":9,"linkType":24,"id":25},{"id":415,"image":416,"imgAlt":417,"headline":418,"copy":185,"tags":419,"url":420,"sys":421,"locale":377},"5P401MFihXIhN1rS8IU1iA","https:\u002F\u002Fmedia.ffycdn.net\u002Fus\u002Foctave\u002Fd\u002FAxHXcdw8k2gg6nuB","AdobeStock_503428089","Nippon Steel Engineering leverages Octave Sequence Enterprise to improve project performance management",[],"\u002Flearn\u002Fresources\u002Fcase-studies\u002Fnippon-steel-engineering-leverages-octave-sequence-enterprise",{"space":422,"id":415,"type":13,"createdAt":424,"updatedAt":425,"environment":426,"publishedVersion":428,"revision":60,"contentType":429,"locale":377},{"sys":423},{"type":9,"linkType":10,"id":11},"2026-02-20T17:36:40.612Z","2026-06-11T15:29:42.170Z",{"sys":427},{"id":18,"type":9,"linkType":19},60,{"sys":430},{"type":9,"linkType":24,"id":25},[]]