[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"case-study-es-black-cat-succeeds-on-qatar-project-through-accuracy-and-automation-published":3,"related-case-study-pages-es-black-cat-succeeds-on-qatar-project-through-accuracy-and-automation":217,"related-resource-case-study-files-es-black-cat-succeeds-on-qatar-project-through-accuracy-and-automation":267,"transform-bt3QuoteSection-5QRqLsHlgefk0kVPzZCKCp-es":91},{"type":4,"data":5},"page",{"sys":6,"metadata":25,"fields":56,"_fallbackInfo":214},{"space":7,"id":12,"type":13,"createdAt":14,"updatedAt":14,"environment":15,"publishedVersion":19,"revision":20,"contentType":21},{"sys":8},{"type":9,"linkType":10,"id":11},"Link","Space","mnlyapxnu8ls","4VczeCMMWwd2p3AD5bx12Q","Entry","2026-06-22T16:59:30.089Z",{"sys":16},{"id":17,"type":9,"linkType":18},"master","Environment",14,1,{"sys":22},{"type":9,"linkType":23,"id":24},"ContentType","caseStudy",{"tags":26,"concepts":27},[],[28,32,35,38,41,44,47,50,53],{"sys":29},{"type":9,"linkType":30,"id":31},"TaxonomyConcept","22hFAve5IR6JomZOYmlzYh",{"sys":33},{"type":9,"linkType":30,"id":34},"22X9SQXsZ6RlLK6C4M7J9y",{"sys":36},{"type":9,"linkType":30,"id":37},"3RMMO69W8WTDMqUPld1Fpb",{"sys":39},{"type":9,"linkType":30,"id":40},"4DADLo8wlPk5yy31ege8Ql",{"sys":42},{"type":9,"linkType":30,"id":43},"4lYr7gZA4bQsUQWRCy226L",{"sys":45},{"type":9,"linkType":30,"id":46},"4OLzI1zzOWVL3hABFkJoa3",{"sys":48},{"type":9,"linkType":30,"id":49},"4WzW7mQiASXieAQnOIUE9N",{"sys":51},{"type":9,"linkType":30,"id":52},"6ICAcNoTiNB6FGZ4hwveI0",{"sys":54},{"type":9,"linkType":30,"id":55},"Wr8kZmnLXJodQwzMzLlYE",{"internalTitle":57,"title":57,"slug":58,"hidePageFromSearchEnginesNoindex":59,"excludeLinksFromSearchRankingsNofollow":59,"blocks":60,"headline":57,"cta":103,"backgroundImageFrontify":122,"displayBreadcrumbs":121,"caseStudyDetailBody":137,"cardDisplayImage":207},"Black Cat succeeds on Qatar project through accuracy and automation","black-cat-succeeds-on-qatar-project-through-accuracy-and-automation",false,[61],{"sys":62,"metadata":73,"fields":76},{"space":63,"id":65,"type":13,"createdAt":66,"updatedAt":66,"environment":67,"publishedVersion":69,"revision":20,"contentType":70},{"sys":64},{"type":9,"linkType":10,"id":11},"5QRqLsHlgefk0kVPzZCKCp","2026-06-22T16:58:17.173Z",{"sys":68},{"id":17,"type":9,"linkType":18},6,{"sys":71},{"type":9,"linkType":23,"id":72},"bt3QuoteSection",{"tags":74,"concepts":75},[],[],{"internalTitle":77,"imageFrontify":78,"quote":99,"quoteAuthor":100,"quoteAuthorTitle":101,"theme":102},"Black Cat case study - Quote",[79],{"id":80,"title":81,"name":82,"ext":83,"height":84,"width":85,"created":86,"generic_url":87,"preview_url":88,"dynamic_url":89,"src":88,"metadataValues":90,"focalPoint":91,"tags":92,"copyright":93,"licenses":96,"description":91,"type":97,"appVersion":98},"eyJpZGVudGlmaWVyIjoyMjQxLCJ0eXBlIjoiYXNzZXQifQ==","Octave-Background-4","2aaaff0e5d3a1548bd069dc10a157c705caff42f.png","png",1440,2560,"2026-02-03T02:09:57.000+00:00","https:\u002F\u002Fbrand.octave.com\u002Fapi\u002Fasset\u002FeyJjbGllbnRJZCI6ImNvbnRlbnRmdWwiLCJpZCI6MjI0MSwidGltZXN0YW1wIjoxNzgyMTQ3NDg4LCJ2ZXJzaW9uIjoxNzcwMDg0NTk3fQ:octave:DKz4g-FJpzGjhmCJxg96_aWsXEMOx3VZCV072NRlD7Y\u002Fdownload","https:\u002F\u002Fmedia.ffycdn.net\u002Fus\u002Foctave\u002Fksogn1jbWz8Ltw9sPYoC.png","https:\u002F\u002Fmedia.ffycdn.net\u002Fus\u002Foctave\u002Fd\u002FuHLqh6ZGEu1JMmnK",[],null,[],{"status":94,"notice":95},"UNKNOWN","",[],"Image","2.0.0","By using Forte 3DWorx, we guaranteed that the amount of site modification on the piping spools was minimal and that the piping fabrication and erection were executed smoothly.","Ahmad Akila","Senior piping engineer, Black Cat","dark",{"sys":104,"metadata":115,"fields":118},{"space":105,"id":107,"type":13,"createdAt":108,"updatedAt":108,"environment":109,"publishedVersion":111,"revision":20,"contentType":112},{"sys":106},{"type":9,"linkType":10,"id":11},"36rXUi94DypUg1LDYA1BgL","2026-06-22T16:52:33.041Z",{"sys":110},{"id":17,"type":9,"linkType":18},3,{"sys":113},{"type":9,"linkType":23,"id":114},"ut3ExternalLink",{"tags":116,"concepts":117},[],[],{"linkTitle":119,"url":120,"openInNewTab":121},"Download Case Study","https:\u002F\u002Fmedia.ffycdn.net\u002Fus\u002Foctave\u002Fd\u002F6289e55ab6674f3390576fd841706448",true,[123],{"id":124,"ext":83,"src":125,"name":126,"tags":127,"type":97,"title":128,"width":129,"height":130,"created":131,"licenses":132,"copyright":133,"appVersion":98,"focalPoint":91,"description":91,"dynamic_url":134,"generic_url":135,"preview_url":125,"metadataValues":136},"eyJpZGVudGlmaWVyIjoxOTYyLCJ0eXBlIjoiYXNzZXQifQ==","https:\u002F\u002Fmedia.ffycdn.net\u002Fus\u002Foctave\u002F53zK62HMsCKRe9Xy67DX.png","AdobeStock_834987945.png",[],"AdobeStock_834987945",1960,1080,"2026-01-31T00:03:18.000+00:00",[],{"notice":95,"status":94},"https:\u002F\u002Fmedia.ffycdn.net\u002Fus\u002Foctave\u002Fd\u002FVMwzmNoKn6PL6bz6","https:\u002F\u002Fbrand.octave.com\u002Fapi\u002Fasset\u002FeyJjbGllbnRJZCI6ImNvbnRlbnRmdWwiLCJpZCI6MTk2MiwidGltZXN0YW1wIjoxNzgyMTQ3MjE1LCJ2ZXJzaW9uIjoxNzY5ODE3Nzk4fQ:octave:WaLtIAA-AK_tJ1wD0DWaLJchPiwcC0yFk8hta_gIwuw\u002Fdownload",[],{"data":138,"content":139,"nodeType":206},{},[140,149,157,164,171,178,185,192,199],{"data":141,"content":142,"nodeType":148},{},[143],{"data":144,"marks":145,"value":146,"nodeType":147},{},[],"Headquartered in Doha, Qatar, Black Cat Engineering & Construction (Black Cat) has been providing engineering, procurement, installation and commissioning for three decades on complex projects in multiple industries and disciplines. Its experience and capabilities extend from oil and gas to industrial facilities and infrastructures, with it multidisciplinary teams providing clients with expertise during the feasibility phases through to the professional execution of the projects.","text","paragraph",{"data":150,"content":151,"nodeType":156},{},[152],{"data":153,"marks":154,"value":155,"nodeType":147},{},[],"Identifying goals","heading-2",{"data":158,"content":159,"nodeType":148},{},[160],{"data":161,"marks":162,"value":163,"nodeType":147},{},[],"Qatar Fertilizer Company (QAFCO) chose Black Cat to design and install a flash tank and knock-out drum for ammonia recovery and flare systems for two plants, the Ammonia 1 and 2 units, providing a three-month schedule to complete the project. Located in Mesaieed, Qatar, the project required the design of 24-inch flare headers, 18-inch and 12-inch blow down headers, a new pipe rack and a safety relief valve (SRV) outlet connection from all the equipment in the two units. Piping length totaled approximately one kilometer with diameters ranging from one inch to 24 inches in schedules 20, 30, 40 and 80.",{"data":165,"content":166,"nodeType":148},{},[167],{"data":168,"marks":169,"value":170,"nodeType":147},{},[],"Black Cat’s assignment encompassed design, erection, installation, testing, pre-commissioning, commissioning and performance testing, plus overall project management and training. ",{"data":172,"content":173,"nodeType":156},{},[174],{"data":175,"marks":176,"value":177,"nodeType":147},{},[],"Overcoming challenges",{"data":179,"content":180,"nodeType":148},{},[181],{"data":182,"marks":183,"value":184,"nodeType":147},{},[],"Because 50% of the piping work was to be done with the plant shut down, full accuracy was a critical priority to ensure precise fit at installation, so that the length of the shut down could be kept to a minimum. The project required accurate engineering deliverables including as-built models and drawings of equipment, pipe racks and piping for the facility’s two ammonia units to ensure both sound design and accurate deliverables for the small bore piping. Black Cat was able to leverage the visualization that Forte 3DWorx provides to ensure the accuracy of the model and design.",{"data":186,"content":187,"nodeType":148},{},[188],{"data":189,"marks":190,"value":191,"nodeType":147},{},[],"The project’s demands for accuracy were compounded by the three-month schedule. Using Forte 3DWorx visualization for the modeling, Black Cat incorporated Aspect Pipe Stress and Aspect Pressure Vessel to analyze stresses on piping and vessels. This collaborative design and engineering approach with the automation of the deliverables, including bills of material, allowed it to meet these combined challenges.",{"data":193,"content":194,"nodeType":156},{},[195],{"data":196,"marks":197,"value":198,"nodeType":147},{},[],"Realizing results",{"data":200,"content":201,"nodeType":148},{},[202],{"data":203,"marks":204,"value":205,"nodeType":147},{},[],"With the capabilities of Forte 3DWorx, Aspect Pipe Stress and Aspect Pressure Vessel, Black Cat engineers saved significant time and finished the piping within a costly shutdown.","document",[208],{"id":124,"ext":83,"src":125,"name":126,"tags":209,"type":97,"title":128,"width":129,"height":130,"created":131,"licenses":210,"copyright":211,"appVersion":98,"focalPoint":91,"description":91,"dynamic_url":134,"generic_url":212,"preview_url":125,"metadataValues":213},[],[],{"notice":95,"status":94},"https:\u002F\u002Fbrand.octave.com\u002Fapi\u002Fasset\u002FeyJjbGllbnRJZCI6ImNvbnRlbnRmdWwiLCJpZCI6MTk2MiwidGltZXN0YW1wIjoxNzgyMTQ3MjI2LCJ2ZXJzaW9uIjoxNzY5ODE3Nzk4fQ:octave:_NF-Tyt9n_GGPFr30drf9eXV4poyohNe6VH1jRLa6e0\u002Fdownload",[],{"usedFallback":121,"requestedLocale":215,"actualLocale":216},"es","en",[218,235,251],{"id":219,"image":220,"imgAlt":221,"headline":222,"copy":95,"tags":223,"url":224,"sys":225,"locale":215},"CYOuqrjxIyXUFI9FbTrVj","https:\u002F\u002Fmedia.ffycdn.net\u002Fus\u002Foctave\u002Fd\u002Fbg1FkSeCT8VfexpW","DOS-15_CDWx_China-Hi-Tech","China Hi-Tech (Jiangxi) saves time and improves accuracy with Forte 3DWorx on viscose facility",[],"\u002Flearn\u002Fresources\u002Fcase-studies\u002Fchina-hi-tech-jiangxi-saves-time-and-improves-accuracy-with-forte-3dworx-on-viscose-facility",{"space":226,"id":219,"type":13,"createdAt":228,"updatedAt":229,"environment":230,"publishedVersion":232,"revision":111,"contentType":233,"locale":215},{"sys":227},{"type":9,"linkType":10,"id":11},"2026-06-22T17:29:50.041Z","2026-06-22T17:32:45.727Z",{"sys":231},{"id":17,"type":9,"linkType":18},32,{"sys":234},{"type":9,"linkType":23,"id":24},{"id":236,"image":237,"imgAlt":238,"headline":239,"copy":95,"tags":240,"url":241,"sys":242,"locale":215},"7vMd6LeJKkzdb66Y1dRPzx","https:\u002F\u002Fmedia.ffycdn.net\u002Fus\u002Foctave\u002Fd\u002FZrfeZwv2xfL1BUK6","AdobeStock_1198703643","Welcron Hantec uses Octave design solutions to deliver pilot biomass plant",[],"\u002Flearn\u002Fresources\u002Fcase-studies\u002Fwelcron-hantec-uses-octave-design-solutions-to-deliver-pilot-biomass-plant",{"space":243,"id":236,"type":13,"createdAt":245,"updatedAt":245,"environment":246,"publishedVersion":248,"revision":20,"contentType":249,"locale":215},{"sys":244},{"type":9,"linkType":10,"id":11},"2026-06-22T15:17:11.800Z",{"sys":247},{"id":17,"type":9,"linkType":18},23,{"sys":250},{"type":9,"linkType":23,"id":24},{"id":252,"image":253,"imgAlt":254,"headline":255,"copy":95,"tags":256,"url":257,"sys":258,"locale":215},"tBn6C3TesaFrL6jnat9m7","https:\u002F\u002Fmedia.ffycdn.net\u002Fus\u002Foctave\u002Fd\u002Fb76b146af606499c8002a03876a67170","Offshore construction platform for production oil and gas. Oil and gas industry . Production platform and operation process during sunset time","Agility Group benefits from Octave Aspect Pipe Stress and Forte 3D interface on offshore rig upgrade in North Sea",[],"\u002Flearn\u002Fresources\u002Fcase-studies\u002Fagility-group-benefits-from-octave-aspect-pipe-stress-and-forte-3d",{"space":259,"id":252,"type":13,"createdAt":261,"updatedAt":261,"environment":262,"publishedVersion":264,"revision":20,"contentType":265,"locale":215},{"sys":260},{"type":9,"linkType":10,"id":11},"2026-06-19T15:02:21.328Z",{"sys":263},{"id":17,"type":9,"linkType":18},18,{"sys":266},{"type":9,"linkType":23,"id":24},[]]